7DQGEHUJ'DWD *HQHUDO'HVFULSWLRQDQG6SHFLILFDWLRQV
7DQGEHUJ'/73URGXFW0DQXDO 
127(
The transient voltage is the actual peak voltage above the normal ac
voltage from the power source.
)DVW7UDQVLHQW%XUVWVIRU3RZHUDQG'DWD&DEOHV
2 kV S/W recoverable errors
No hardware failures
+LJK(QHUJ\7UDQVLHQW9ROWDJHIRU3RZHU&DEOHV
1.2 kV
2.5 kV
No errors
S/W recoverable errors
No hardware failures
/RZ/HYHO&RQGXFWHG,QWHUIHUHQFH
3 V (rms) 80% modulated 1
kHz
No errors
S/W recoverable errors
No hardware failures
)DVW7UDQVLHQW%XUVWVIRU3RZHUDQG'DWD&DEOHV
2 kV S/W Recoverable errors
No hardware failures
7DEOH
&RQGXFWHG6XVFHSWLELOLW\
)DLOXUH7\SH (TXLSPHQW )DLOXUH/HYHO $OORZDEOH(UURUV
Hard Office 1 to 12 kV No Operator Intervention (soft
recoverable allowed)
Hardware Office Up to 15 kV No component damage operator
intervention allowed (soft/hard
errors allowed)
7DEOH
(6')DLOXUH/HYHO/LPLWV