
Constant Voltage Zero Calibration
Note: Perform this procedure only after completing Voltage Monitor and Remote Readback Full Scale Calibration.
a.Send string "VSET 0; ISET 5; OUT ON".
b.Connect an external supply to the power supply as shown in Figure
c.Attach the DVM from - S to + S on the rear panel.
d.Adjust A8R40 (CV PROG ZERO) to 0 ±120∝V.
Current Monitor Zero Calibration
a.Send string "VSET 0; ISET 0; OUT OFF''.
b.Connect a short across power supply output terminals.
c.Attach the DVM from M to IM on the rear panel.
d.Allow several minutes (3 or more) to ensure thermal settling.
e.Adjust A2R8
Constant Current Zero Calibration
a.Connect the test setup shown in Figure
b.Send string ''VSET 5; ISET 0; OUT ON''.
c.Allow several minutes (3 or more) to ensure thermal settling.
d.Adjust A8R29 (CC PROG ZERO) to: 0V ±0.6mV (6030A, 6035A)
0V ±8.0mV (6031A)
0V ±1.7mV (6032A)
Figure 2-3. CC Zero Calibration Setup
18