Figure 2-9. CC PARD Test Setup

Initialization Procedure

Follow the procedure if either the GPIB assembly has been replaced, or the EEPROM (U70) has been replaced:

1.Install the GPIB assembly in the unit.

2.Turn the power on and depending on your unit's model number, send string: "EEINIT 6030"

"EEINIT 6031'' "EEINlT 6032" or

''EEINIT 6035"

3.Turn the power off, wait 5 seconds, then turn the power back on.

4.If the GPIB assembly has been replaced, calibrate the unit.

31

Page 30
Image 30
Agilent Technologies 6032A, 6035A, 6031A, 6030A service manual Initialization Procedure, CC Pard Test Setup