
Chapter 5 Service
Operating Checklist
Operating Checklist
Before returning your power supply to Agilent Technologies for service or repair check the following items:
Is the Power Supply Inoperative?
Verify that the ac power cord is connected to the power supply.
Verify that the
Verify that the
Use the 2.5 AT, 250 V fuse for 100 or 115 Vac operation.
Use the 2 AT, 250 V fuse for 230 Vac operation.
Verify the
See "To prepare the power supply for use" page 23.
Does the Power Supply Fail Self-Test?
Verify that the correct
See "To prepare the power supply for use" page 23.
Remove all load connections to the power supply.
Ensure that all terminal connections are removed while the
93
5