Chapter 2. CLI Syntax Reference

/cx show diag

This command extracts controller diagnostics suitable for technical support usage. Note that some characters might not be printable or rendered correctly (human readable). It is recommended to save the output from this command to a file, where it can be communicated to technical support or further studied with Linux utilities such as od(1).

In order to redirect the output you must run the following command from a command line, not from within the tw_cli shell.

tw_cli /c0 show diag > diag.txt

/cx show rebuild

9000 series controllers support background tasks and allow you to schedule a regular time when they occur.

Rebuild is one of the supported background tasks. Migrate and initialize are other background tasks that follow the same schedule as rebuild. Other background tasks for which there are separate schedules are verify and selftest. For each background task, up to 7 time periods can be registered, known as slots 1 through 7. Each task schedule can be managed by a set of commands including add, del, show and set a task. Background task schedules have a slot id, start-day-time, duration, and status attributes.

For details about setting up a schedule for background rebuild tasks, see “Setting Up a Rebuild Schedule” on page 50.

Rebuild activity attempts to (re)synchronize all members of redundant units such as RAID-1, RAID-10, RAID-5 and RAID-50. Rebuild can be started manually or automatically if a spare has been defined. Scheduled rebuilds will take place during the scheduled time slot, if enabled the schedules are enabled. For in depth information about rebuild and other background tasks, see “About Background Tasks” in the 3ware Serial ATA RAID Controller User Guide.

The show rebuild command displays the current rebuild background task schedule as illustrated below.

//localhost> /c1 show rebuild Rebuild Schedule for Controller /c1

========================================================

Slot Day HourDuration Status

--------------------------------------------------------

1

Mon

2:00pm

10

hr(s)

disabled

2

Thu

7:00pm

18

hr(s)

disabled

3

-

-

-

 

disabled

4

-

-

-

 

disabled

5

-

-

-

hr(s)

disabled

6

Mon

1:00am

4

disabled

7

Sun

12:00am

1

hr(s)

disabled

46

3ware Serial ATA RAID Controller CLI Guide

Page 52
Image 52