Features
Belkin PureAV Hybrid AVU1500 UPS
Shutdown | When | Power | Notes |
|
| Outlets |
|
Stage 1 | Battery’s | High Current | e.g., amplifier |
| usable power | Filter Bank D | and subwoofer |
| supply is |
|
|
| at 90% |
|
|
|
|
|
|
Stage 2 | Battery’s | Analog Filter | |
| usable power | Bank B and | can lose power without |
| supply is | Digital Filter | problems (e.g., CD players, |
| at 50% | Bank C | DVD players) |
|
|
|
|
Stage 3 | Battery’s | Digital Filter | Critical devices that should |
| usable power | Bank A | be powered as long as |
| supply is |
| possible to save settings, |
| at 0% |
| record TV shows, etc. |
|
|
| (e.g., VCR, DVR, satellite/ |
|
|
| cable boxes) |
If you prefer to avoid the staged shutdown procedure, then you have the ability to override it and supply power to all the rear power outlets until the usable battery power is depleted or the power comes back on (whichever comes first).
Stage Time
You have the ability to see how much approximate
Of course, the estimated times are based on which components are on at that moment and how much power each is consuming. Changes in your home theater system’s power consumption will affect
7