Belkin PureAV Hybrid AVU1500 UPS
Setup and Installation
6.Test your switched outlets:
a.If you are not using the remote trigger feature, then your AVU1500’s
b.Press the “Switched” button to power on all the switched outlets.
c.All the switched outlets should power on: “Switched” and “No Delay” should power on immediately, while “Switched” and “Delay” should power on after the delay interval you specified (i.e., 5, 10, or 15 seconds).
d.All the home theater equipment connected to switched outlets should receive power and you should be able to turn them on (if they are not already on).
e.With all the switched outlets powered on, and all associated devices turned on, press the “Switched” button again to cut power to all the switched outlets.
f.This should cause all the switched outlets to lose power: “Switched” and “Delay” should lose power immediately, while “Switched” and “No Delay” should lose power after the delay interval you specified.
If the system behaves as expected, then congratulations. If this test reveals activities inconsistent with your expectations, then you may have to make adjustments (e.g., connect equipment to different outlets or set new power profiles for various filter banks). In all cases, keep using your “power planning” table and keep it synchronized with your actual system setup.
Shutdown Test
Your AVU1500 can simulate a power outage and
a minute.
So, if you’re ready to try, then you should...
7.Make sure your AVU1500 is on, the switched outlets are on, and all relevant home theater equipment is on.
8.Press and hold your AVU1500’s
a.If you start this test and wish to stop it before it finishes, then during the test, simply press the “Test” button once and the test will be canceled. The unit will return to a normal operating mode.
37