CONTENTS

4. With your left hand, hold the thread near the thread

 

 

 

 

1 —

spool. With your right hand, hold the end of the thread,

 

 

and use both hands to set the thread around the thread

 

 

guides.

 

 

1Projection in the thread guides

5. Pass the thread around the projection in the thread guides, then pass the thread under the pretension disk. Make sure to set the thread securely under the preten- sion disk.

1Thread guide shaft

2 Pretension disk

2 —

3 —

4 —

1

2

6. Follow steps 9 - 14 from the previous section (see pages

 

1-27,1-28).

5 —

 

6 —

 

7 —

 

8 —

 

9 —

 

?!

1-30

Setting Up

Page 41
Image 41
Brother ULT2002D operation manual 27,1-28