Chapter 3 Maintaining the Server

Installing or Replacing Components

If you have the LFF version of the server with 3.5-in drives, the four screws install on the bottom of the sled.

If you have the SFF version of the server with 2.5-in drives, two screws install on each side of the sled.

c.With the ejector lever still open, push the sled into the drive bay until you feel the drive stop against the backplane.

d.Press the ejector lever flat until the lock clicks into place.

Figure 3-10 Drive Numbering and Physical Orientation, Facing Server Front (Large Form Factor)

HDD_01

HDD_02

HDD_03

HDD_04

Figure 3-11 Removing and Replacing Hard Drives (Large Form Factor)

1

Console

Reset

PSU MEM CPU

195725

2

3

4

1

Release button

3

Hard drive sled, bottom view

 

 

 

 

2

Ejector lever

4

Securing screws (four)

 

 

 

 

 

Cisco UCS C200 Server Installation and Service Guide

3-18

OL-20732-02

Page 58
Image 58
Cisco Systems UCS C200 M1, R2001120402 manual HDD01 HDD02 HDD03 HDD04