![](/images/new-backgrounds/1066117/661179x1.webp)
Reference Manual
Rosemount 3051N
Revision Status
|
| Changes from June 2006 to June 2008 |
|
|
|
Page (Old) | Page (New) | Changes |
|
|
|
Cover, | Cover, | Document revision date change from June 2006 to June 2008, |
throughout | throughout | rev from BA to CA |
|
|
|
Page i, back | CE mark added with Rosemount Nuclear Instruments, Inc. | |
| cover |
|
-Page iii Add Revision Status page
i to iv and | Page numbers changed | |
| to |
|
|
|
|
Throughout | Throughout | Manual number corrected to |
|
|
|
Changed significant digits to conform to standard | ||
|
|
|
Removed word ‘process’ from sentences indicating user responsibility for qualifying the connection | ||
|
| interface |
|
|
|
Reworded flange bolt description to reflect qualification configuration |
NOTE
The above Revision Status list summarizes the changes made. Please refer to both manuals for complete comparison details.
www.rosemountnuclear.com