installation instructions, optional components, reference, 3
installing
mounting brackets, 71 installing optional components, 3 inventory list, xv
L
LEDs, ports, and slots illustrated, 7, 8 left and right sides defined, 15
levers, locking, See "slide rail assembly locks" locating pins for mounting brackets, 71 locations of ports, slots, and LEDs (illustration), 7, 8 locks, See "slide rail assembly locks"
logging into service processor
using network management port, 46, 52 using serial management port, 46, 47
M
map of OpenBoot PROM devices, 56 minimum cable connections, 6
modem not for use with the SER MGT serial management port, 35
mounting bracket
N
network management port configuring and enabling, 46
not operational until configured, 5, 46 null modem cable adapters, 37
null modem cable for TTY serial port, 37
O
optional components, installation instructions in service manual, 3
P
parity for serial terminal, no, 43 password command, 47 passwords, ILOM, 42
powering on the system for the first time, 41 poweroff command, 60
poweron command, 54
R
removing server from rack, 39, 79 reset
resetting the service processor with reset /SP, 51
resetting the system with uadmin, 59 right and left sides defined, 15
right side defined, 15
S
screws for rack mounting, 21 serial terminal
required before powering on, 43 settings, 43
service processor
See also ILOM set command, 49
set command, 49
show /SP/network command, 50
slots, ports, and LEDs illustrated, 7, 8 Solaris media kit contents, 6
82 SPARC Enterprise T5120 and T5220 Servers Installation Guide • August 2007