To boot the server, you must connect and configure the network and serial ports. The procedures are given in the following sections.
■“To Connect the Service Processor Serial Management Port” on page 35
■“To Connect the Service Processor Network Management Port” on page 36
■“To Connect the Ethernet Network Cables” on page 36
■“To Connect the AC Power Cable to the Server” on page 38
The servers also have serial and USB ports available for connections to optional devices.
■“TTYA Serial Port” on page 37
Note – When you are finished connecting the cables to the server, ensure that the server can slide smoothly in and out of the rack without binding or damaging the cables. See the section, “To Verify the Operation of the Slide Rails and the CMA” on page 30.
Connector Locations
FIGURE
32 SPARC Enterprise T5120 and T5220 Servers Installation Guide • August 2007