b.To initiate the power on sequence, type the start /SYS command.

You will see an ILOM CLI alert message on the system console. This indicates that the system has reset.

-> start /SYS

Are you sure you want to start /SYS (y/n)? y

Starting /SYS

->

c. Switch to the system console to view POST output.

->start /SP/console

Watch the POST output for possible fault messages. The following output is a sign that POST did not detect any faults:

.

.

.

0:0>POST Passed all devices. 0:0>

0:0>DEMON: (Diagnostics Engineering MONitor) 0:0>Select one of the following functions 0:0>POST:Return to OBP.

0:0>INFO:

0:0>POST Passed all devices.

0:0>Master set ACK for vbsc runpost command and spin...

2. Check the POST execution result with the following command:

-> show /SP/faultmgmt -level all

Note – Depending on the configuration of ILOM, POST variables, and whether POST detected faults or not, the server might boot, or the system might remain at the ok prompt. If the system is at the ok prompt, type boot.

3.Use the set /SYS keyswitch_state=normal command to return the virtual keyswitch to Normal mode (default) so that the system can power on and start the boot process.

->set /SYS keyswitch_state=normal

54 SPARC Enterprise T5120 and T5220 Servers Installation Guide • August 2007