4.Slide the green release tab (FIGURE C-9).

5.Push the server all the way into the the rack until it locks into place (FIGURE C-9).

FIGURE C-9Sliding the Express Rail Release Tab and Securing the Server in the Rack

Caution – Before continuing, verify that the server is securely mounted in the rack, and that the slide rails are locked in the mounting brackets.

78 SPARC Enterprise T5120 and T5220 Servers Installation Guide • August 2007