The rackmounting kit for each server comes with the same cable management arm (CMA) assembly. The CMA installation procedures are the same for both servers. See “Installing the Cable Management Arm for Both Servers” on page 25.
Connecting the Server CablesTo boot the server, you must connect and configure the network and serial ports. For instructions, see “Connecting the Server Cables for Both Servers” on page 32.
Managing Cables With the CMA
Managing the cables with the CMA is the same for both servers. See “Managing Cables With the CMA” on page 38.
Dismounting the ServerTo install or replace internal parts in the server, you must first remove the server from the rack. For the removal procedure, refer to the SPARC Enterprise T5120 and T5220 Servers Service Manual.
Appendix C Installing the Servers With the Express Rail Rackmounting Kit 79