C H A P T E R 1

Preparing for Installation

This chapter provides background information about both the servers installation procedures that are provided in Chapter 2.

This chapter contains these topics:

“Tools and Equipment Needed” on page 3

“Optional Component Installation” on page 3

“ESD Precautions” on page 4

“Installation Overview” on page 4

“Cabling Notes for Both Servers” on page 6

“Slide Rail Assembly Notes for Both Servers” on page 10

“Cable Management Notes for Both Servers” on page 13

“Safety Precautions” on page 14

The SPARC Enterprise T5120 server is a 1 rack unit (1U) server (FIGURE 1-1) and the SPARC Enterprise T5220 server is a 2 rack unit (2U) server (FIGURE 1-2).

1