Galaxy 65 Troubleshooting

7.21 Spare Parts and Ancillary Items

The following replaceable parts are available for the Galaxy 65 Subsystem:

Chassis (including Backplane)

 

RS232 cable

• AC Power Supply/Cooling Module

 

LAN cable

Drive Carrier Module

• 19 inch rack mounting rail kit

Storage Manager Module

Dummy Carrier Module

• External FC-AL Signal Cables

Blank SM Module

Cables

SFP module, optical

 

LC - LC optical cable

SFP module, copper

 

LC - SC optical cable

Battery, Li-ion

 

SFP - SFP copper patch cable (1 M length)

• (Country specific) power cords

 

HSSDC2 - HSSDC1

Bifurcated power cords

 

HSSDC2 - DB9

• Keys for Drive Carrier modules.

 

HSSDC2 - HSSDC2

All documentation

7.22 Upgrading Your LRC I/O Modules

You can upgrade your existing JBOD or RAID LRC module to a Rorke Data Galaxy 65 RAID LRC module in accordance with the following procedure:

Caution Ensure that your Power Supply/Cooling modules are marked with P/N 44191-XX. If they are not you will need to upgrade your PSUs. Please contact your supplier and request the upgrade modules.

1Change the Ops Panel switch settings to those shown in Table 7–9.

Important Switch settings are only read at Power On.

The Galaxy 65 enclosure ID must always be set to select ID1.

2Remove the existing LRC modules in accordance with the procedure in 7.12.3.1, ”Removing the Module”, on page 72.

3Install the Storage Manager modules in accordance with the procedure in 7.12.3.2, ”Inserting the Module”, on page 73.

87

Page 107
Image 107
Galaxy Metal Gear 65 manual Spare Parts and Ancillary Items, Upgrading Your LRC I/O Modules