ELECTRICAL CONNECTION INSTALLATION

CHAPTER 3: ELECTRICAL INSTALLATION

3.6Electrical Connection Installation

Choose the diagram that best suits your application and maintain the CT polarity. Follow the outlined procedure to verify correct connection.

IMPORTANT: For PT connections only, short terminals 3 and 4.

Connect local ground to terminal 3. This protects the unit from spikes and transients.

The meter and terminal module DSP3 are factory calibrated together; the serial numbers are matched on both. The DSP3 input module and the meter base MUST MATCH!

Mismatching of the meter and DSP3 input module will cause inaccurate readings because calibration ratios are stored in the meter’s memory, not in the DSP3 input module.

3.6.1List of Connection Diagrams

See phase reversal if a message of CBA appears after installation.

Fig 3-1

Three-Phase, Three-Wire System Delta with Direct Voltage and CTs

 

 

 

Three-Phase, Three-Wire Open Delta with two CTs and two PTs

Fig 3-2

(Open Delta System should only be used if the electrical system is a 3-wire 2

PT OPEN DELTA

 

Open Delta can be enabled or disabled in Programming GROUP 0,

 

FUNCTION 3, Chapter 9, section 9.4)

 

 

Fig 3-3

Three-Phase, Three-Wire Open Delta with three CTs and two PTs

 

 

Fig 3-4

Three-Phase, Four-Wire Wye with Direct Voltage and CTs

 

 

Fig 3-5

Three-Phase, Four-Wire Wye with CTs and PTs

 

 

VI

Single Phase with CT and PT Connection

 

 

VII

Dual-Phase System

 

 

VIII

Three Phase System

 

 

3–10

EPM 5300 SERIES ADVANCED POWER METERS – INSTRUCTION MANUAL

Page 22
Image 22
GE EPM 5300, EPM 5200, EPM 5350 instruction manual Electrical Connection Installation, List of Connection Diagrams