GE EPM 5350, EPM 5200 EPM 5300 Series Meters Programming Group 2 Meter Calibration

Models: EPM 5300 EPM 5200 EPM 5350

1 134
Download 134 pages 15.43 Kb
Page 95
Image 95

GE Consumer & Industrial

Multilin

EPM 5300 Series Meters

Chapter 11: Programming

Group 2 - Meter

Calibration

WARNING—READ THIS SECTION CAREFULLY BEFORE PROCEEDING:

Any rescaling, such as a change in a transformer ratio, can be accomplished in GROUP 1. Calibration is not necessary.

Meter calibration cannot be performed if the meter is installed for service. The sensing inputs must be connected to a power supply with variable voltage and separate current outputs.

The calibration procedure requires highly accurate and stable input signals. Incorrect readings result from improper calibration procedures. If unsure, return unit to the factory for calibration.

BEFORE calibrating any channel, make a note of its Full Scale Setting (see Chapter 10). Set the Full Scale in accordance with Table 10-2 for calibration. Restore original Full Scale Setting when calibration is completed.

EPM 5300 SERIES ADVANCED POWER METERS – INSTRUCTION MANUAL

11–83

Page 95
Image 95
GE EPM 5350, EPM 5200 instruction manual EPM 5300 Series Meters Programming Group 2 Meter Calibration