GE UPVH890 Installation Instructions FINAL SETUP, Level The Dryer, Attach Serial Cable, Servicing

Models: UPVH890

1 152
Download 152 pages 17.16 Kb
Page 31
Image 31
Installation Instructions

Installation Instructions

FINAL SETUP

1LEVEL THE DRYER

Stand the dryer upright near the final location and adjust the four leveling legs at the corners to ensure that the dryer is level from side to side and front to rear.

Raise Lower 1LEVEL THE DRYER

2ATTACH SERIAL CABLE

Attach the serial cable for washer and dryer connection to the serial port on the back of the dryer.

Attach the other end of the cable to the washer before pushing the washer into its final position.

Serial Port

Rear of

Dryer

3PLUG DRYER IN

Ensure proper ground exists before use.

4GROUNDING INSTRUCTIONS

This appliance must be grounded. In the event of malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. This appliance is equipped with a cord having an equipment-grounding conductor and a grounding plug. The plug must be plugged into an appropriate outlet that is properly installed and grounded in accordance with all local codes and ordinances.

5DRYER STARTUP

Press the POWER button.

NOTE: If the dryer has been exposed to temperatures below freezing for an extended period of time, allow it to warm up before pressing POWER. Otherwise, the display will not come on.

The dryer is now ready for use.

SERVICING

2ATTACH SERIAL CABLEWARNING – Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation after servicing/installation.

For replacement parts and other information, refer to the back cover for servicing phone numbers.

31

Page 31
Image 31
GE UPVH890 Installation Instructions FINAL SETUP, Level The Dryer, Attach Serial Cable, Plug Dryer In, Dryer Startup