Honeywell MKXXII Unpacking and Inspec ting the Equipment, Equipment Installation 2.3.1 General

Models: MKXXII

1 254
Download 254 pages 42.79 Kb
Page 33
Image 33

Honeywell

MK XXII EGPWS Installation Manual

SECTION II - INSTALLATION

2.1 Introduction

This section contains suggestions and factors to consider before installing the Enhanced Ground Proximity Warning System. Close adherence to these suggestions will assure satisfactory performance from the equipment.

NOTE

The conditions and tests performed on this article are minimum performance standards. It is the responsibility of those desiring to install this article either on or within a specific type or class of aircraft to determine that the aircraft installation conditions are within these performance standards. The article may be installed only if further evaluation by the applicant documents an acceptable installation and is approved by the Administrator.

2.2 Unpacking and Inspec ting the Equipment

Exercise extreme caution when unpacking equipment. Perform a visual inspection of the unit for evidence of damage incurred during shipment. If a damage claim must be filed then save the shipping container and all packing materials to substantiate your claim. The claim should be filed as soon as possible. The shipping container and all packing materials should be retained in the event that storage or reshipment of the equipment is necessary.

2.3Equipment Installation 2.3.1 General

The following paragraphs contain information pertaining to the installation of the MK XXII EGPWS, including instructions concerning the location and mounting of the equipment. The equipment should be installed in the aircraft in a manner consistent with acceptable workmanship and engineering practices, and in accordance with the instructions set forth in this publication. To ensure the system has been properly and safely installed in the aircraft, the installer should make a thorough visual inspection and conduct an overall operational check of the system, on the ground, prior to flight.

CAUTION

AFTER INSTALLATION OF THE CABLING AND BEFORE INSTALLATION OF THE EQUIPMENT, A CHECK SHOULD BE MADE WITH THE AIRCRAFT PRIMARY POWER SUPPLIED TO THE MOUNTING CONNECTOR, TO ENSURE THAT POWER IS APPLIED ONLY TO THE PINS SPECIFIED IN THE INTERWIRING DIAGRAMS IN SECTION III.

CAGE CODE: 97896 SCALE: NONE SIZE: A DWG NO: 060-4314-225

REV: C SHEET 33

Page 33
Image 33
Honeywell MKXXII installation manual Unpacking and Inspec ting the Equipment, Equipment Installation 2.3.1 General