configuration options procedure for changing, 3-12 tables
Alarm, C-24
Cross Connect, C-11
DTE Interface, C-4 General, C-15
Management and Communication, C-26 Network Interface, C-2
Port, C-6
User Interface, C-17 worksheets, C-33
connectors 10BaseT port, D-4 rear panel
cabling examples, 2-5 functional description, 1-4 physical description, 1-3 pin assignments, D-1– D-14
CPU failure message, 5-2 crossover cable, D-7
CSS (Controlled Slip Seconds) report, 5-7 Customer 1 configuration area, 3-12 Customer 2 configuration area, 3-12
D
data channel loopback (DCLB), 5-24, C-9 data port. See PORT (1–2) interface data terminal loopback (DTLB), 5-25, C-9 database, SNMP, 1-2
Device Fail message, 5-3 dimensions, B-2
DS0 channel allocation. See channel allocation DTE Drop/Insert interface
channel allocation procedure, 4-8 configuration options, C-4 failure message, 5-2
front panel LED indications, 3-3 functional description, 1-2, 1-4, 2-1 managed by SNMP, E-1
physical description, 1-3 pin assignments, D-3 technical specifications, B-1 troubleshooting, 5-15
DTE loopback (DLB), 5-22 configuration option, C-4 external control interface, D-3
E
EER (Excessive Error Rate) condition ASCII terminal/printer message, 5-12 Device Health and Status message, 5-3 front panel LED indication, 3-2, 3-3 Performance Report message, 5-7 troubleshooting, 5-16
EIA–530–A interface, D-8 Embedded Data Link (EDL)
configuration option, C-7
used with SNMP system, 1-2, 2-3, 2-4, F-1 enterprise-specific trap, 5-13
environmental specifications, B-2 equalization, line, C-4
error messages. See messages, alarm ES (Errored Seconds) report, 5-6 Ethernet port, 1-2, 1-4
configuring, 4-3 connector, D-4 IP address, C-23 protocol, C-23 statistics, 5-8 status, 5-8
external modem interface, D-7
F
Facility Data Link (FDL) configuration option, C-2
used with SNMP system, 1-2, 2-3, 2-4, F-2 Factory 1 configuration area, 3-12
Factory 2 configuration area, 3-12 failure analysis. See troubleshooting failure message, troubleshooting, 5-16 features, 1-1– 1-4
fractional T1, 2-1, 2-2
framing configuration option, C-2, C-4 front panel
operation, 3-1
physical description, 1-3, 3-1
I
indicators. See LEDs, front panel IP (Internet Protocol) addressing
configuration option, C-26, C-27 for 10BaseT port, C-23 example of use, F-1 procedure for configuring, 4-5
IP Routing Table, 5-10