
5
Disassembly and Cleaning
2 Remove the Power Unit Cover. (3 screws)
3 Replace the Fuse of PU1.
Main Power Unit: PU1
AC250V 12A(100/120V area)
AC250V 6.3A(220/240V area)
4 Replace the Fuse of PU2.
Projection Lamp Regulator: PU2
AC125V 5A(100/120V area)
AC250V 5A(220/240V area)
5.4.12 Replacing the Main Fuse
1 Replace with New Fuse. Main Fuse:
120V area: 250V 10A
220/240V area: 250V 6.3A
74