
FRONT | FRONT UPPER STS2 BRACKET |
(2 PLACES)
CAP SCREW
SPLIT LOCK WASHER M12
FLAT WASHER M12 (SEE DETAIL C)
(2 PLACES)
CAP SCREW
FRONT
FRONT UPPER STS2 BRACKET
NOTE:
SEE DWGS PS215000, PS215002, AND PS215003
FOR DETAILS.
REAR
REAR UPPER
STS2 BRACKET
Figure 33 Installation drawing,
46
REAR SIDE | REAR UPPER STS2 BRACKET |
FIG. 1
BOTTOM VIEW OF STS2 WITH UPPER BRACKETS
REAR | REAR LOWER STS2 BRACKET |
(3 PLACES)
CAP SCREW
SPLIT LOCK WASHER M12 FLAT WASHER M12
FIG. 2
RIGHT SIDE VIEW OF STS2 WITH UPPER BRACKETS
LEVELER FOOT NUT
LEVELER FOOT
DETAIL C
seismic floor stand 100-250A
REAR LOWER
BRACKET
REAR FRONT
FRONT
FIG. 3
TOP VIEW OF FLOOR STAND
WITH LOWER REAR MOUNTING BRACKET
| FIG. 4 |
| RIGHT SIDE VIEW OF FLOOR STAND |
INSTALLATION DRAWING | WITH LOWER REAR MOUNTING BRACKET |
| |
FOR SEISMIC FLOOR STAND | PS215001 Rev. 0 |
Installation Drawings