TROUBLESHOOTING & REPAIR

T1 TRANSFORMER TEST (continued)

FIGURE F.1 – LEAD #532 AT POWER PC BOARD

LEAD 526

LEAD 527

T1

TRANSFORMER

LEAD 532

LEAD 31

115 VAC

TEST PROCEDURE

Return to Section TOC

Return to Master TOC

1.Remove input power to the LN-9 GMA wire feeder.

2.Using the phillips head screwdriver, remove the screws holding the left side cover assembly.

3.Disconnect lead #532 from the power PC board terminal. See Figure F.1.

4.Apply power (115VAC) to the T1 transformer primary leads #31 and #532. See Figure F.1 and the Wiring Diagram.

5.Using the volt-ohmmeter, check for 28VAC at secondary leads #526 and #527. See Figure F.1. Place the meter probes where the leads attach to the power PC board ter- minals.

Return to Section TOC

Return to Master TOC

WARNING

Electric Shock can kill.

With power applied, there are high voltages inside the wire feeder. Do not reach into the wire feeder or touch any internal part of the wire feeder while power is applied.

LN-9 GMA Wire Feeder

Page 89
Image 89
Lincoln Electric SVM138-A service manual T1 Transformer Test, Test Procedure