Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

F-34

F-34

TROUBLESHOOTING & REPAIR

HALL EFFECT MODULE TEST AND ALIGNMENT

WARNING

Service and repair should be performed by only Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid elec- trical shock, please observe all safety notes and precautions detailed throughout this manual.

If for any reason you do not understand the test procedures or are unable to perform the test/repairs safely, contact the Lincoln Electric Service Department for electrical troubleshoot- ing assistance before you proceed. Call 216-383-2531 or 1-800-833-9353 (WELD).

DESCRIPTION

This test will help determine if the Hall Effect Module is correctly aligned and functioning prop- erly.

MATERIALS NEEDED

9/16” Wrench

Analog volt/ohmmeter (multimeter) Phillips head screwdriver

The Hall Effect Module Test takes approximately

10 minutes to perform.

The Hall Effect Alignment Procedure takes approximately

10 minutes to perform.

LN-9 GMA Wire Feeder

Page 98
Image 98
Lincoln Electric SVM138-A service manual Hall Effect Module Test and Alignment, Description