Lincoln Electric SVM170-A service manual F-16TROUBLESHOOTING AND REPAIRF-16, Test Procedure

Models: SVM170-A

1 109
Download 109 pages 57.27 Kb
Page 56
Image 56
F-16TROUBLESHOOTING AND REPAIRF-16

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-16TROUBLESHOOTING AND REPAIRF-16

RECTIFIER DIODE BRIDGE TESTING (continued)

FIGURE F.2 — G3521 RECTIFIER DIODE BRIDGE LOCATION.

RECTIFIER

DIODE BRIDGE

(D2)

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

TEST PROCEDURE

1.Disconnect the main AC input power to the machine.

2.Remove the case top and side panels with a 3/8 in. nutdriver.

3.Perform the Main Transformer Test to ensure the proper voltages are supplied to the J5 plug on the Control board.

4.Locate the following leads:

LEAD

208

209

354

206

Leads #208, #209, and #354 are con- nected to the rectifier diode bridge (D2). See Figure F.2. Lead #206 is connect- ed at the output shunt. See the wiring diagram.

5.Connect main input power to the machine.

POWER MIG 255C

Page 56
Image 56
Lincoln Electric SVM170-A F-16TROUBLESHOOTING AND REPAIRF-16, RECTIFIER DIODE BRIDGE TESTING continued, Test Procedure