Equipment Required

1

 

Equipment Required

The following equipment is required to complete an MVME2603/2604 system:

VME system enclosure

System console terminal

Operating system (and/or application software)

Disk drives (and/or other I/O) and controllers

Transition module (MVME712M or MVME761) and connecting cables

MVME2603/2604 VME modules are factory-configured for I/O handling via either MVME712M or MVME761 transition modules.

Overview of Startup Procedure

The following table lists the things you will need to do before you can use this board and tells where to find the information you need to perform each step. Be sure to read this entire chapter, including all Caution and Warning notes, before you begin.

Table 1-1. Startup Overview

What you need to do...

Refer to...

 

 

Unpack the hardware.

Unpacking Instructions on page 1-5

 

 

Configure the hardware by setting

MVME2603/2604 Base Board Preparation on page 1-6

jumpers on the boards and transition

and MVME712M Transition Module Preparation on

modules.

page 1-14or MVME761 Transition Module Preparation

 

on page 1-25

 

 

Ensure memory mezzanines are

RAM200 Memory Mezzanine Installation on page 1-35

properly installed on the base board.

 

 

 

Install the MVME2603/2604 VME

MVME2603/2604 VME Module Installation on page

module in the chassis.

1-42

 

 

http://www.motorola.com/computer/literature

1-3

Page 23
Image 23
Motorola MVME2600 manual Equipment Required, Overview of Startup Procedure, Startup Overview