Motorola SG 2000 operation manual RF chassis and location of the SG2-RPM/C or SG2-RPM/S board

Models: SG 2000

1 105
Download 105 pages 11.1 Kb
Page 70
Image 70

5 - 6

O p e r a t i o n

For upgrading to split return operation, with DS-SG2-DRT-2X/A transmitters installed in positions A and B, the SG2-RPM/C board must be replaced with an SG2-RPM/S board. The main RF chassis must be removed to perform this exchange. Figure 5-9 illustrates the inside bottom view of the RF chassis, the location of the SG2-RPM/C board, and the removal sequence:

Figure 5-9

RF chassis and location of the SG2-RPM/C or SG2-RPM/S board

Cover

SG2-RPM/C

Power connector

RF chassis

1Remove any fuses at F1, F2, F3, F5, or F6 to prevent arcing of the housing connectors.

2Remove the six 5/16-inch hex-head screws that secure the RF chassis to the housing. Remove the housing.

3Remove the six ¼-inch hex-head screws that secure the rear cover. Remove the cover.

SG 2000 Installation and O peration Manual

Page 70
Image 70
Motorola SG 2000 operation manual RF chassis and location of the SG2-RPM/C or SG2-RPM/S board