B e n c h S e t u p

3 - 2 3

S G 2 0 0 0 A c t i v a t i o n W o r k s h e e t

This worksheet is provided as a convenient reference to log pertinent information associated with setting up the SG 2000 node.

Configurator

_ _ _/_ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _ _- _

number

 

 

Technician

_______________

 

Node number

_______________

 

Node location

_______________

 

Date

_______________

 

Temperature

_______________

 

Channel load

_______________

 

Power requirements

Voltage

Input/Output

Power source

_____ _____

_____ _____

Port 1

_____ _____

_____ _____

Port 2

_____ _____

_____ _____

Port 3

_____ _____

_____ _____

Port 4

_____ _____

_____ _____

Output levels

Low Frequency

High Frequency

Port 1

Level _____

Level _____

Port 2

Level _____

Level _____

Port 3

Level _____

Level _____

Port 4

Level _____

Level _____

ADU frequency

_____

 

Received optical

_____ Vdc

 

power

 

 

SG2-LR output level

_____

 

JXP values

 

 

Receiver output

_____ dB

 

pad

_____ dB

 

Interstage pad

_____ dB

 

Port 1 pad

_____ dB

 

Port 2 pad

_____ dB

 

Port 3 pad

_____ dB

 

Port 4 pad

_____ dB

 

Gain reserve

 

 

AC powering

AC input power is provided to which port? _____

Is more than one power source used to power the station? _____ yes _____ no

Does the node have an FTEC surge suppressor? _____yes _____ no

Is a second gas-tube surge suppressor required? _____ yes _____ no

Does the node contain one or two power packs? _____

Are fuses removed from output ports that do not require ac power? _____ yes _____no

S G 2 0 0 0 I n s t a l l a t i o n a n d O p e r a t i o n M a n u a l

Page 56
Image 56
Motorola SG 2000 operation manual 2 0 0 0 a c t i v a t i o n W o r k s h e e t