Setting Up Infrastructures |
Adding a Campus
Step 1 Go to Infrastructure in the setup area on the application Main Page. Select the company where the campus will reside. The Company Info window for that company will appear.
Step 2 Click the Add button. Enter the name and location of the campus in the
Step 3 Attachments and Notes are available as needed. In the Company Info window, you may insert a Company drawing by clicking the Add link in the Attachments area. You may add comments pertaining to the company in the Notes area of this page as well.
Step 4 Click Save when you have entered all campus information.
Step 5 A plus sign appears next to the company icon in the Navigator Tree indicating that there is infrastructure information at the next level down. Click plus (+) changing it to a minus
Remove a Campus:
Step 1 Highlight the company, which will bring up the Company Info screen. Step 2 Select the Campus to be deleted.
Step 3 If the campus has no subordinate items, such as buildings, you can click Remove to remove the campus and add another. If you try to remove the campus while items exist underneath it, a Cable Management warning box pops up: "The campus cannot be deleted until subordinate items are removed."
Step 4 Click Save to complete the deletion. The campus's name will be removed from the Navigator Tree.
Although you add and remove a Campus through the Company Info screen, the
Attachments and Notes sections apply to the Company.
NOTE
Buildings
Each campus you set up will contain buildings that contain spaces that house components of the infrastructure. Your company may have one building, or numerous buildings that can be interconnected by cabling components. After spaces are in place, you can start to specify cabling and hardware.
Adding a Building
Step 1 On the Cable Management Main Page, select Infrastructure on the SETUP menu.
MA4000 Expense Management Cable Management User Guide - Issue 1