2-26Operation, administration, and maintenance (OAM) features

Table 2-3

Node D squelch map (example)

Connection

SAP node ID

End node ID

 

 

 

b

A

B

 

 

 

c

D

A

 

 

 

d

C

D

 

 

 

If Node D fails, path c is squelched at Node A and path d is squelched at Node C. Path b is not squelched, as the path is rerouted from Node A to Node B by the protection switch. Path a is unaffected by the protection switch, as it does not route through the failed node.

OPTera Metro 3500 Multiservice Platform NTRN10AN Rel 12.1 Standard Iss 1 Apr 2004

Page 64
Image 64
Nortel Networks NTRN10AN, 3500 manual 26Operation, administration, and maintenance OAM features