6. Maintenance and inspection

7. Attach the front panel.

Push the front panel toward the main body.

Use a screwdriver to securely tighten (clockwise) the 4 screws on the front panel.

Tighten the 4 screws.

1

2

Battery replacement is now complete.

<After replacing the battery during operation...>

If the battery replacement indicator is displayed and the beeper sounds before replacement, press the beeper stop/test button once to stop the beeper, and hold it for 5 sec. to perform a self-diagnostic test. The beeper stops and normal operation resumes after the 10-second test is complete.

<After replacing the battery when operation was stopped...>

Connect the AC input plug to a wall outlet (commercial power) and turn ON the power switch of the UPS. When operation starts, the self-diagnostic test is automatically performed. Normal operation resumes after the 10-second test.

Write the usage start date on the label on the front. Also, by using the included UPS monitor- ing software, possible to keep a record of usage start date by the software.

61

Page 63
Image 63
Omron BU1002SW, BU3002SW specifications After replacing the battery during operation