UPS Setup

Unloading the Cabinet(s)

The following tools are required for unloading the cabinet(s):￿15 mm wrench or socket￿7 mm nutdriver or socket

C A U T I O N

The UPS and EBM are heavy (see page 10). Unloading the cabinets requires at least two people to safely remove the cabinets from the pallet.

To remove the UPS or EBM from the shipping pallet:

1.Remove the two M10 bolts securing the stabilizing bracket to the pallet (see Figure 2).

M10 bolts

Figure 2. Removing the Stabilizing Bracket Bolts

Powerware® 9155 UPS (8–15 kVA) User’s Guide S 164201553 Rev D www.powerware.com

11