
10.Route the gray signal cable through the grommet on the left side of the bypass switch cabinet (see Figure 27). Connect the white and black pair of wires to
Secure each connection, tightening the terminal screws to a maximum 3.5 in lb (0.4 Nm). Provide strain relief for cables by installing plastic cable ties.
NOTE DO NOT connect the red and black pair of wires in the gray signal cable.
Do Not Connect Red
and Black Wires
Signal Cable
To UPS Terminal Block
Figure 27. Signal Cable Installation
11.Replace the bypass switch front cover and the UPS wiring access cover.46 | Powerware® 9155 UPS |