Chapter 1 Installation

Power/Data Cable

Ferrite

First Wrap

 

Long Connector

(To Validator)

20.0 ± 0.5 inches

Short Connector

(To Controller Board)

Power/Data Cable

Second Wrap

Figure 4. Wrapping the Power/Data Cable Around the Ferrite

4.Using the end of the power/data cable with the short connector, insert the cable through the ferrite. (Figure 4.)

5.Wrap the power/data cable around the ferrite twice.

6.Adjust the position of the ferrite so that the length from the ferrite to the long connector is 20 ± 0.5 inches.

18

Page 18
Image 18
Printronix T5000e Series user manual Wrapping the Power/Data Cable Around the Ferrite