Chapter 1 Installation
18
Figure 4. Wrapping thePower/Data Cable Around the Ferrite
4. Usingthe end of the power/data cable with the short connector,
insert the cable through the ferrite. (Figure 4.)
5. Wrapthe power/data cable around the ferrite twice.
6. Adjustthe position of the ferrite so that t he length from the
ferrite to the long connector is 20 ± 0.5 inches.
Power/DataCable
Second Wrap
ShortConnector
(ToController Board)
Power/DataCable
FirstWrap Ferrite
LongConnector
(ToValidator)
20.0± 0.5
inches