Manuals
/
Quinny
/
Power Tools
/
Air Compressor
Quinny
65040-AB
manual
Models:
65040-AB
1
85
86
86
Download
86 pages
8.63 Kb
79
80
81
82
83
84
85
86
<
>
Troubleshooting
Specs
Install
Motor Overload Fault
Auto Dual Time Delay
Safety Alert Symbols
Warranty
Dimension
Network Configuration Menu
Reset Service Hourmeters
Page 85
Image 85
Page 84
Page 86
Page 85
Image 85
Page 84
Page 86
Contents
QSD Series
Page
Table of Contents
Section V Maintenance or Service Preparation
Standard Warranty
Dimensional Data air-cooled
Dimensional Data water-cooled
Section I General
Safety Precautions
Spare Parts Ordering Information
Safety Alert Symbols
Section II Description
Compression Cycle and Air Flow
General Description
Lubricating Fluid System
Cooling System
Moisture Separator
Water-cooled
Capacity Control System
Electrical System
Shutdown Conditions
Back-up Control
Safety Sensors
Indicators
Main Power on Light
High Discharge Air Temperature Lights
Section II Description
Moving the Unit to the Installation Site
Section III Installation
Receiving
Location
Piping Connections
Piping Fit-up
Manual Shutoff Valve
Guards
Electrical
Water Quality
Water Flow
Fan Rotation
Fluid Level
Prior to Starting
Section IV Operating Procedures
Starting the Compressor
Stopping the Compressor Normal Operation
Pressure Readings
Temperature Readings Water-cooled
Stopping the Compressor Emergency
Section V Preparing for Maintenance or Service
This page Intentionally Left Blank
Fluid Specifications
Safety
Section VI Servicing
Fluid Life
Air Filter
Input Shaft Seal
Preparation for New Seal Installation
Airend Sealing System
Seal Installation
Pressure Switch
Section VII Service Adjustments
Pressure Switch Back-up Operating Mode
Adjusting Pressure Switch
This page Intentionally Left Blank
Introduction to Power$ync
Section Viii Power$ync II Operation
Back-up Mode Operation
Do not switch modes with power on the compressor
Auto Dual Time Delay
Multiple Machine Operational Mode
Single Machine Operational Modes
Continuous Run
Network Load Delay Time
Pressure Settings
Connecting Cable to the Power$ync II Circuit Board
Network Installation
Rocker Switch Settings
Network Setup
Network Voltage Tests on Power$ync II Systems
UP/DOWN DEADBAND, F1 EDIT, Enter Return
Start-up
Power-up Displays
Section Viii Power$ync II Operation
U19 Memory Failure Contact Your Service Representative
Compressor in Back-up Mode
U19 Data Checksum Error Press F2 to Update
Deadband Data Error Press F1 to Clear
U19 Data not Initialized Press F2 to Initialize
Filter Needs Servicing Please Replace AS Soon AS Possible
Operational Displays
Start-up Displays
Additional Sensors
Compressor is Starting
Compressor is Unloaded
Compressor is Unloaded Minutes Left to Shutdown
Programmed Shutdown
Mode and Pressure Displays
Compressor Settings and Maintenance Displays
Compressor Mode of Operation Auto Dual Timed Stop Press F1
Press F2
Press F1 to change the load and unload pressures
Read Pressure Settings pages 34-35 before
Please Wait Network Configuration in Progress
Machine ID Setup
Machine ID for this Compressor Press Enter to Accept Value
Sequence Network Data
Before setting or changing a sequence, read
UP/DOWN POSITION, F1 EDIT, Enter Return
UP/DOWN Machine ID, Enter Return
DAY Monday SEQ Abcd
Network Configuration Menu
DAY Monday SEQ
To clear a particular sequence from the memory, press F1
Reset Service Hourmeters
Filter Service Hourmeters
Compressor Hourmeter Menu Compressor Hourmeters
Intake Filter Hours
Fluid Filter Hours Reset to Press Enter to Return
Press F1 to Reset Fluid Filter Hours Press Enter to Return
Press F1 to Reset Fluid Hours Press Enter to Return
Fluid Hours Reset to Press Enter to Return
Time Menu To View Current Time
Compressor Maintenance Menu Compressor Control Test
To SET Time and Date
Time and Date Menu Current Time on this Control
Compressor Control Test Menu Unload Valve Test Press F1
Horsepower
Unload Press
Fluid Press
Modem Baud Rate Setup
Unit Configuration Date
Compressor Diagnostic Menu View Shutdown LOG
Network Diagnostic
Section Viii Power$ync II Operation
ETOL00 FTOL00 Network Connection Data Confidence
Modem INITIALIZATION** Init
Indicator is lit, the indicator will remain lit
F1 to EDIT/ENTER to Accept Value
Compressor has Shut Down Emergency Stop Button WAS Pressed
Sequence Data Error Press F1 to Clear Schedule Data Error
Compressor has Shut Down Take Corrective Action
Back-up Mode until all faults have been corrected
Inlet Temp
Fluid Pressure
STG 1 OUT Temp STG 2 in Temp
Emergency Stop Pressed
Shutdown Log Messages
Motor Overload
STG 2 Discharge RTD Failure
Control log has no entries at that point
Probable Causes Corrective Action Failure to Start
Section IX Troubleshooting
Unscheduled Shutdown
Section IX Troubleshooting
Probable Causes Corrective Action Unscheduled Shutdown
High Discharge Air Temperature
Frequent Air Cleaner Clogging
Probable Causes Corrective Action Low Air Delivery
Frequent Fluid Filter Clogging
Compressor does not Unload when there is no Air Demand
Too Rapid Cycling Between Load and Unload
Excessive Fluid in Buffing Air Vent Bowls
Pressure Relief Valve Exhausting
Water in Buffing Air Vent Bowls
Excessive Fluid in Gearbox Vent Bowl
High Interstage Pressure
Low Delivery Pressure
Microprocessor Will Not Display Messages
Erroneous Displays
Interval Action
Section X- Maintenance Schedule
Daily Operating Record
Quincy Compressor QSD
Quincy Compressor QSD
Top
Page
Image
Contents