Raypak 85, 120 manual DIMENSIONS AND CONNECTIONS Fig, Recommended minimum service clearances

Models: 120 85

1 68
Download 68 pages 52 Kb
Page 14
Image 14
DIMENSIONS AND CONNECTIONS (Fig. 4)

DIMENSIONS AND CONNECTIONS (Fig. 4)

Recommended minimum service clearances

1” (25 mm)

5-1/2” 8-5/8”

(140 mm) (219 mm)

 

 

or elbow

(300mm)12”

 

 

frommm150casing abovemm25 flue applicable)(whicheveris

1” (25 mm)

 

 

 

 

 

 

 

 

 

30-3/4” (781 mm)

 

 

(150mm)

 

150 mm

 

 

 

 

6”

 

 

 

 

 

 

 

 

 

 

 

sag 6-13/16” (173 mm)

water 4-7/8” (124 mm)

14-1/8” (359 mm)

30-3/4” (781 mm)

Fig. 4

XPak 85 = 15-3/4” (400 mm)

XPak 120 = 17-3/4” (451 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

=

 

 

 

 

 

 

 

 

=

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1” (25 mm)

 

 

 

 

 

 

 

XPak 85= 3-15/16“ (97 mm) 1” (25 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

XPak 120= 4-1/2“ (114 mm)

Minimum Clearances to Combustibles

Top=0

Front =0 AL, CL

Rear=0

Left=0

Right=0

AL = Alcove

CL = Closet

Note:

The XPak boiler has passed the zero inches vent clearance to combustibles testing requirements provided by the boiler Harmonized Standard ANSI Z21.13b 2007 – CSA 4.9b 2007 and therefore is listed for zero clearance to combustibles when vented with a single wall special venting system (AL29-4C material) or UL/ULC-listed gas vent material. The zero inches vent clearance to combustibles for the XPak boiler supercedes the clearance to combustibles listing that appears on the special venting system label.

14

Page 14
Image 14
Raypak 85, 120 DIMENSIONS AND CONNECTIONS Fig, Recommended minimum service clearances, Minimum Clearances to Combustibles