PACKAGING AND TRANSPORTATION

PACKAGING AND TRANSPORTATION

1. SCOPE OF DELIVERY

The boiler is delivered fully assembled.

-When receiving the delivery, check if the packaging is intact.

-Check that all the items listed in Table 2 are included in the delivery.

2. TRANSPORTING THE BOILER

CAUTION: The boiler may be damaged when it is improperly secured.

-Only transport the boiler using the right transportation equipment, such as a handtruck with a fastening belt or special equipment for maneuvering steps.

-During transportation the boiler must be secured on the transportation equipment to prevent it from falling off.

-Protect all parts against impacts if they are to be transported.

-Observe the transportation markings on the packaging.

-Packaged boilers must always be lifted and carried to their destination by two people, or you must use a handtruck or special equipment to transport them to their destination.

-Transport the boiler to the room where it is to be installed.

3.BOILER BOX CONTENT (Table 2)

Pos.

Parts

Quantity

Packaging

1

Boiler with casing

1

1 box

2

Wall bracket

1

 

3

Technical documents

1

 

 

including:

 

 

 

- User’s Instructions

 

 

 

- Installation Instructions

 

 

 

- Wall Mounting Template

 

 

4

Top manual air vent drain pipe

1

 

5

Gas shut off valve

1

 

6

Flue gas adaptors including:

1

 

 

- vent adaptor for two pipes

 

 

 

vent system

 

 

 

- intake air adaptor for two pipes

 

 

 

- 3” adaptor

 

 

 

- 4 screws

 

 

7

LPG conversion kit

1

 

 

- injector black coated

 

 

 

- LPG sticker

 

 

 

- LPG conversion labelling

 

 

 

- Conversion instructions

 

 

Refer to Fig. 5 for Boiler box contents.

2

1

3

4

Fig. 5

C

L

CENTER LINE

OF BOILER

Manual backgroundWARNING

This boiler is heavy and awkward to lift. It is recommended and safer to install the boiler with two people. Use caution as to not drop this boiler which could cause personal injury. Verify that the boiler is securely mounted before leaving the boiler unsupervised.

Ensure there is adequate clearances for mounting the boiler (details given in installation instructions).

The wall mount bracket is designed for a stud spacing of 16 inches from center. For other stud spacing a solid mounting surface must be provided by the installer.

Do not mount the boiler to a hollow wall. Be sure to mount the boiler to the studs only.

Mount the wall bracket using 4 5/16" lag screws. Ensure the bracket is level when mounted.

Extreme care is needed to ensure the bolts are secured in the studs.

Hang the boiler on the bracket and secure the bottom of the boiler with two (2) additional lag screws.

XPak

XPak

120

120

XPak

XPak

85

85

IN

OUT

5

6

7

15

Page 15