START-UP CHECKLIST FOR FAN-ASSISTED

START-UP CHECKLIST FOR FAN-ASSISTED

RAYPAK PRODUCTS

This start-up checklist is to be completely filled out by the service technician starting up the Raypak Boiler for the first time. All information may be used for warranty purposes and to ensure that the installation is correct. Additionally this form will be used to record all equipment operation functions and required settings.

GASSUPPLYDATA

 

 

Regulator Model & Size

_________ /

CFH

Gas Line Size (in room)

____________

In. NPT

Length of Gas Line

____________

Eq Ft

Gas Shut-Off Valve Type

____________

 

( Ball, Lube cock)

 

 

Sediment Trap

____________

Y/N

Port

_______Std__

Full

VISUAL INSPECTION OF COMPONENTS

Verify inspection was done and condition of components are in good working order with a “yes”

Wiring Harness

_____________ Y/N

Burner/s (flame)

_____________ Y/N

Remote flame sense

_____________ Y/N

VENTING

 

Vent Size:___________

Stack Height:_____

Category: _________

sketch vent on reverse side ***

Vent Material:

__________________

Vent Termination Type:

__________________

Combustion Air Openings:

Low __________in2

Ventilation air

High _________ in2

EMISSIONSSETTINGSANDTESTINFORMATION(ATFULLFIRE)

Blower Pressure Setting

______________ In. WC

Supply Gas Pressure

______________ In. WC

Verify stable pressure static &

dynamic condition

Manifold Gas Pressure

_____________ In. WC

Tracking Pressure (clean filter) ______________In. WC

CLEARANCES

 

Front Clearance

_______________In.

Right Side Clearance

_______________In.

Left Side Clearance

_______________In.

Rear Clearance

_______________In.

Overhead Clearance

_______________In.

ELECTRICAL

 

Voltage Supply (VAC)

No Load______ Load_____

Voltage -24 VAC

_____________ VAC

Voltage Com to Ground

_____________ VAC

Operating Control Setting _____________deg F

Sketch plumbing on reverse side

WATER SUPPLY

Flow Rate in GPM or Delta T __________ If Avail

Measure flow rate at full fire

Number of Tanks and Size Qty____ ____ Gallons

Plumbing Size

_______________

Pump Size: _________ (boiler)

Pump HP: ________

Impeller trim____________

Pump Model________

Louvers __________________

Screens____________

Nominal Factory Recommended Settings

See manual or card tag

See manual or card tag

See manual or card tag

The following measurements must be obtained with a Combustion Analyzer.

NOX

_____________ PPM

Less than 20 PPM (If required by Certifying Agency)

Free Oxygen

_____________ %

See manual

CO

_____________ PPM

Less than 170 PPM

CO2

_____________ %

See manual

Model Number: ______________________________

***Note: draw venting with details, such as extractors, barometric dampers, blast dampers or draft inducers

Serial Number: _______________________________

Site Altitude Above Sea Level __________________Ft.

Job Name _______________________________________________________________________________________

Address _________________________________________________________________________________________

Physical Location of Boiler: Indoors______; Outdoors______; Ground Level______; Roof______; Below Grade______

Mechanical Contractor / Installer _______________________________________________________________________

Date and Time of Start-up _____________Print Name and Signature of Start-up Technician_________________________

Information must be faxed to: (805) 278-5471 in order to ensure warranty consideration Attn: Service Manager