A "First Setup" is required when the controller supply is switched on for the first time or after the factory settings have been restored.

Switching on the device

The power stage supply is switched off.

 

Disconnect the product from the the fieldbus during commissioning in order to avoid conflicts by simultaneous access.

Switch on the controller supply.

The device goes through an initialization routine, all LEDs are tes- ted, all segments of the 7-segment display and the status LEDs light up.

After the initialization, the fieldbus interface must be configured. The product is configured via the integrated HMI or the commissioning software.

First Setup via HMI

Fault Edit Value Unit

 

 

 

 

Op

 

 

 

 

Mon

 

 

 

 

Conf

 

 

 

 

ESC

 

 

 

Fault Edit Value Unit

<1s

 

 

 

Op

 

 

 

 

 

 

 

 

Mon

Fault Edit Value Unit

1.

 

2.

Conf

Op

 

<1s

ESC

 

 

 

 

 

 

 

Mon

 

 

 

 

Conf

 

 

 

 

 

2 x

 

<1s

 

=

=

 

 

 

=

IP

Subnet

Fault Edit Value Unit

Op

Mon

Conf

1.

2.

<1s

ESC

2 x

<1s

1. 2. <1s ESC

2 x <1s

 

 

 

 

 

Fault Edit Value Unit

Fault Edit Value Unit

Fault Edit Value Unit

1.

 

2.

Op

 

 

Op

Op

 

<1s

ESC

Mon

Mon

Mon

 

 

 

Conf

Conf

Conf

 

 

 

 

 

 

2 x

 

<1s

 

 

 

 

 

 

Fault Edit Value Unit

Fault Edit Value Unit

Fault Edit Value Unit

1.

2.

Op

 

Op

Op

 

<1s

ESC

Mon

 

 

 

 

Mon

Mon

 

 

 

Conf

Conf

Conf

 

 

 

 

 

 

2 x

<1s

 

V1.01, 01.2012

Figure 6: First Setup via the integrated HMI

0198441113843,

38

Modbus-TCP module

Page 38
Image 38
Schneider Electric LXM32M manual First Setup, Switching on the device Power stage supply is switched off