ULTRA HIGH EFFICIENCY

POWER VENT/POWER DIRECT VENT

SERVICE MANUAL

Technical Literature Department ©2008

TABLE OF CONTENTS

INTRODUCTION

2

Qualifications

2

Service Warning

2

Important Service Reminder

2

Instruction Manual

3

Tools Required

3

INSTALLATION CONSIDERATIONS

4

Closed Water Systems

4

Thermal Expansion

4

Air Requirements

5

Contaminated Air

5

Venting

6

Electrical Requirements

8

OPERATION & SERVICE

9

How it works

9

Blower

10

Burner

11

Venturi

14

Gas Valve

15

Gas Pressure Testing

16

Air Pressure Switches

18

Air Pressure Switch Operation

20

Air Pressure Switch Testing

21

Flame Sensing Test

24

Igniter Current Test

25

CONTROL SYSTEM

26

Introduction

26

UIM

27

Discreet Menu - Contact Information

28

Operating Set Point Adjustment

32

Control System Menus

33

CCB

35

Socket Identification

36

Wiring Diagram

39

Sequence of Operation

40

TROUBLESHOOTING

41

Rough Start - Rough Operation

13 and 41

Heater Status Menu

33

Things to Check Before Servicing

41

Reset Procedure

41

Control System Unresponsive

42

Blank Display

42

UIM Inoperable

42

Fault Messages

43

AC Reversed

43

Upper Probe Open

43

Upper Probe Short

44

Flame Probe Short

44

Flame Detect Error

45

Energy Cut Out (ECO)

45

Blocked Inlet

46

Blocked Exhaust Vent

47

Blower Prover Failure

47

Blower Prover Open - Blower Not Running

48

Blower Prover Open - Blower Is Running

48

Low Igniter Current

49

Ignition Failure

50

Gas Valve Failure

52

Communication Failure

52

Page 2
Image 2
State Industries GP650HTPDT, SHE50-100PE, SHE50-100NE manual Ultra High Efficiency Power VENT/POWER Direct Vent