State Industries GP650HTPDT Venting Cont, Pipe Size Requirements, Maximum Elbow Requirements

Models: GP650HTPDT SHE50-100NE SHE50-100PE

1 54
Download 54 pages 60.84 Kb
Page 8
Image 8
VENTING (CONT)

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

VENTING (CONT)

Pipe Size Requirements

Ensure the correct size pipe has been used for the overall equivalent length of the vent and intake air piping installed. Longer equivalent lengths require larger pipe sizes, see Table 1.

Maximum Elbow Requirements

Three and four inch vent and intake air pipe installations allow a maximum of 6 - 90° elbows in the vent pipe AND a maximum 6 - 90°elbows in the intake air pipe. Two inch installations allow a maximum of 3 - 90° elbows in the vent pipe AND a maximum 3 - 90° elbows the intake air pipe.

Table 1

NUMBER

2” MAXIMUM PIPE

3” MAXIMUM PIPE

4” MAXIMUM PIPE

90° ELBOWS

LENGTH FEET (METERS)

LENGTH FEET (METERS)

LENGTH FEET (METERS)

 

 

 

 

1

20 (6.1)

60 (18.3)

120 (36.6)

2

15 (4.6)

55 (16.8)

112 (34.1)

3

10 (3.0)

50 (15.2)

104 (31.7)

4

4 elbows not allowed in 2” pipe

45 (13.7)

96 (29.3)

(use larger pipe size)

 

 

 

 

 

 

 

5

5 elbows not allowed in 2” pipe

40 (12.2)

88 (26.8)

(use larger pipe size)

 

 

 

 

 

 

 

6

6 elbows not allowed in 2” pipe

35 (10.7)

80 (24.3)

(use larger pipe size)

 

 

 

 

 

 

 

Service Notes - Venting

Remove all plastic debris from the edges of intake air pipe sections after cutting on direct vent installations. Plastic debris left on intake air pipe sections can collect inside and clog the burner and lead to rough operation and/or ignition failure. See Service Notes page 11.

Using a smaller pipe size than required for a given length or installing more elbows on the vent pipe can cause the water heater’s control system to declare a fault condition, lock out and display the “Blocked Exhaust” fault message on the UIM display (see page 27).

Overlooking the same requirements for the intake air pipe on direct vent installations or failing to remove the screen from the intake air connection when direct venting can cause the water heater’s control system to declare a fault condition, lock out and display the “Blocked Inlet” fault message on the UIM display (see page 27).

Remove This Screen

For Direct Vent

Installations

The screen inside the intake air connection is meant to keep larger debris from entering the blower when the water heater is installed conventionally; using room air for combustion.

When the water heater is installed in a direct vent configuration the screen inside the intake air connection on the water heater must be removed. If left in place it will become clogged over time and lead to “Blocked Inlet” lock out conditions.

The screen on the intake air termination will keep larger debris from entering the blower on direct vent installations.

Technical Literature Department

7 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Page 8
Image 8
State Industries GP650HTPDT, SHE50-100PE manual Venting Cont, Pipe Size Requirements, Maximum Elbow Requirements, Table