State Industries SHE50-100PE “Blower Prover Failure”, Fault Messages Cont, “Blocked Exhaust Vent”

Models: GP650HTPDT SHE50-100NE SHE50-100PE

1 54
Download 54 pages 60.84 Kb
Page 48
Image 48
“Blocked Exhaust Vent”

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

FAULT MESSAGES (CONT)

DISPLAYED MESSAGE

CHECK/REPAIR

CONDITION/INDICATES

 

 

 

“Blocked Exhaust Vent”

• Check for restrictions, too many equivalent feet,

 

or too many elbows in the vent pipe. Ensure

The control system has detected open contacts at

• Review venting installation section of the

the Blocked Exhaust air pressure switch - the water

Instruction Manual that came with the water

heater is not venting properly.

heater - see Table 1 on page 7 in this manual.

 

Ensure the vent/intake air piping has been

 

installed within manufacturers requirements.

 

• Check all wiring between the Blocked Exhaust

 

air pressure switch and the CCB’s J6 Socket

 

(page 36) pins 5 & 10. Perform close visual

 

inspection of the pins inside the plug and socket

 

- ensure plugs and sockets are mating properly

 

and providing good contact. Repair/replace any-

 

thing worn or damaged.

 

• Review the air pressure switch information

 

beginning on page 18. Perform the pressure

 

switch test procedure for the Blocked Exhaust

 

air pressure switch - see pages 21 through 23.

 

Replace the Blocked Exhaust switch if defec-

 

tive.

 

• Call the technical support phone number shown

 

on the water heater labeling for further assis-

 

tance if the problem has not been corrected

 

after performing the procedures outlined here.

 

 

“Blower Prover Failure”

• Check all wiring between the Blower Prover air

 

pressure switch and the CCB’s J6 Socket (page

The control system has detected closed contacts at

36) pins 6 & 7. Ensure there are no shorted or

pinched wires.

the Blower Prover air pressure switch out of

 

sequence. Blower Prover air pressure switch

• Ensure there are no jumper wires installed on

contacts should be open at the beginning of each

the Blower Prover switch.

heating cycle - see the Sequence of Operation on

• Ensure there are no jumper wires installed

page 40.

between the CCB’s J6 Socket pins 6 & 7.

 

 

• Review the air pressure switch information

 

beginning on page 18. Perform the pressure

 

switch test procedure for the Blower Prover air

 

pressure switch - see pages 21 through 23.

 

Replace the Blower Prover switch if defective.

 

• Call the technical support phone number shown

 

on the water heater labeling for further assis-

 

tance if the problem has not been corrected

 

after performing the procedures outlined here.

 

 

Technical Literature Department

47 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Page 48
Image 48
State Industries SHE50-100PE manual “Blower Prover Failure”, Fault Messages Cont, “Blocked Exhaust Vent”, Displayed Message