State Industries SHE50-100NE Control System Unresponsive, UIM Display Is Blank, UIM is Inoperable

Models: GP650HTPDT SHE50-100NE SHE50-100PE

1 54
Download 54 pages 60.84 Kb
Page 43
Image 43
CONTROL SYSTEM UNRESPONSIVE

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

CONTROL SYSTEM UNRESPONSIVE

DISPLAYED MESSAGE

CHECK/REPAIR

CONDITION/INDICATES

 

 

 

UIM Display Is Blank

• Ensure the on/off switch is on and working -

 

replace switch if defective.

On/Off is turned off

• Check communication cable connections at

Water heater is not plugged in

UIM’s J2 Socket (page 27) and the CCB’s J16

Tripped Breaker - Blown Fuses

Socket (page 36). Secure power and install a

120 VAC power supply problems

new comm cable. (standard Cat 5 network

24 VAC power supply problems

cable).

Defective transformer

• Closely inspect communication ports on CCB

Wiring or plug/socket connection problems

and UIM for damage or wear.

UIM communication cable problems

• Ensure 120 VAC power is properly connected in

Important Service Reminder:

the junction box on the back of the water heater.

When performing any troubleshooting steps outlined

• Ensure 120 VAC is supplied to CCB’s J3 Socket

pins 1 & 3. Hot wire to pin 1, neutral wire to pin 3

in this service manual always consider the wiring

(page 36).

and connectors between components. Perform a

• Check 120 VAC to transformer primary winding

close visual inspection of all wiring and connectors

to a given component before replacement.

at CCB’s J1 socket pins 1 & 3 (page 36) with J1

Ensure wires were stripped before being crimped in

plug removed, power on.

• Check J1 plug and J1 socket on the CCB for

a wire connector, ensure wires are crimped tightly in

wear or damage. Ensure plugs and sockets are

their connectors, ensure connection pins in sockets

mating properly and providing good contact.

and plugs are not damaged or worn, ensure plugs

• Check for 24 VAC from transformer secondary

and sockets are mating properly and providing good

contact.

winding at CCB’s J1 socket pins 4 & 5 with J1

 

plug inserted, power on. If 24 VAC is not present

Failure to perform this critical step or failing to

AND the two checks above were performed and

perform this step thoroughly often results in

the results were successful - replace the trans-

needless down time, unnecessary parts

former. Check all wiring for shorts before power-

replacement, and customer dissatisfaction.

ing up the new transformer.

 

• Call the technical support phone number shown

 

on the water heater labeling for further assis-

 

tance if the problem has not been corrected

 

after performing the procedures outlined here.

 

 

UIM is Inoperable

• Ensure Ribbon Cable from the Button overlay is

 

inserted correctly in UIM J3 Socket (page 27).

UIM does not respond to any user input using the

• Call the technical support phone number shown

operational and/or Up and Down buttons.

on the water heater labeling for further assis-

Water heater may be maintaining water temperature

tance if the problem has not been corrected

after performing the procedures outlined here.

at the last saved setting or may not be operating at

 

all.

 

 

 

Technical Literature Department

42 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Page 43
Image 43
State Industries SHE50-100NE manual Control System Unresponsive, UIM Display Is Blank, UIM is Inoperable, Displayed Message