State Industries SHE50-100NE manual “Blower Prover Open”, Fault Messages Cont, Displayed Message

Models: GP650HTPDT SHE50-100NE SHE50-100PE

1 54
Download 54 pages 60.84 Kb
Page 49
Image 49
“Blower Prover Open”

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

FAULT MESSAGES (CONT)

DISPLAYED MESSAGE

CHECK/REPAIR

CONDITION/INDICATES

 

 

 

“Blower Prover Open”

PERFORM ALL THESE TESTS WITH POWER

(Blower Not Running)

TURNED ON AND A CALL FOR HEAT ACTIVE.

The control system has detected open contacts at

• Check for 120 VAC at the CCB’s J2 Socket

(page 36) pins 1 & 2. Perform close visual

the Blower Prover air pressure switch after Blower

inspection of the pins inside the plug and socket

has been energized.

- ensure plugs and sockets are mating properly

 

and providing good contact.

 

• Check all wiring between CCB’s J2 Socket pins

 

1 & 2 and the blower motor assembly’s high

 

voltage 3 Pin Socket (see page 10).

 

• Disconnect the plug at the blower motor assem-

 

bly’s high voltage 3 Pin Socket - check for 120

 

VAC at the plug end.

 

• Perform close visual inspection of the pins

 

inside the plug and socket at the blower motor

 

assembly’s high voltage 3 Pin Socket - ensure

 

plugs and sockets are mating properly and pro-

 

viding good contact.

 

• Disconnect the plug at the blower assembly’s

 

Low Voltage PWM 5 pin plug (see page 10). If

 

the Blower has not been running prior and starts

 

running when this plug is disconnected - call the

 

technical support phone number shown on the

 

water heater labeling for further assistance.

 

 

“Blower Prover Open”

• Ensure the Blower Prover air pressure switch

(Blower Is Running)

sensing tube is connected properly at both ends

The control system has detected open contacts at

and that it is not kinked or damaged. Repair/

the Blower Prover air pressure switch after Blower

replace anything worn or damaged as neces-

has been energized.

sary.

 

• Check all wiring between CCB’s J6 Socket

 

(page 35) pins 6 & 7 and the Blower Prover air

 

pressure switch. Repair/replace anything worn

 

or damaged as necessary.

 

• Perform close visual inspection of the pins

 

inside the CCB J6 plug and socket - ensure

 

plugs and sockets are mating properly and pro-

 

viding good contact.

 

• Review the air pressure switch information

 

beginning on page 18. Perform the pressure

 

switch test procedure for the Blower Prover air

 

pressure switch - see pages 21 through 23.

 

Replace the Blower Prover switch if defective.

 

 

Technical Literature Department

48 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Page 49
Image 49
State Industries SHE50-100NE “Blower Prover Open”, Fault Messages Cont, Displayed Message, Check/Repair, Blower Is Running