State Industries SHE50-100NE, SHE50-100PE manual Air Pressure Switch Testing, Normal State Test

Models: GP650HTPDT SHE50-100NE SHE50-100PE

1 54
Download 54 pages 60.84 Kb
Page 22
Image 22
AIR PRESSURE SWITCH TESTING

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

AIR PRESSURE SWITCH TESTING

Air pressure switch testing involves three procedures:

Normal State Test

Operational State Test

Pressure Test

Normal State Test

Turn off power and disconnect the wires to the pressure switches. Wrap electrical tape around the wire ends to prevent shorts. A continuity test is performed, using an ohm meter, between the wiring terminals of the switch. The Blower Prover switch has normally open contacts. The Blocked Intake and Blocked Exhaust switches have normally closed contacts.

If this test confirms the Blower Prover switch contacts are open and the Blocked Intake/ Exhaust switch contacts are closed - the switches have passed the test. If test results indicate the Blower Prover switch contacts are closed - the switch must be replaced. If either the Blocked Intake or Exhaust switch contacts are open - the switch must be replaced.

Operational State Test

The operational test is also a continuity test performed with an ohm meter between the pressure switch wiring terminals. However, this test is performed while the blower is running during the pre-purge mode. Ensure the wires to the air pressure switches are disconnected and that electrical tape is wrapped around the wire ends to prevent shorts. Perform a continuity test between the wiring terminals on the air pressure switches with the blower running (water heater in pre-purge mode).

During this test the normally open contacts of the Blower Prover switch should close. The Blower Prover switch “activates” (closes its contacts) during normal operation to verify or “prove” that the blower is running. If the contacts remain open during this test the third test, the pressure test, must be performed to determine if the pressure switch is defective. During this test the Blocked Intake and the Blocked Exhaust switch contacts should remain closed, if the contacts open during this test the third test, the pressure test, must be performed to determine if the pressure switch is defective.

Technical Literature Department

21 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Page 22
Image 22
State Industries SHE50-100NE, SHE50-100PE manual Air Pressure Switch Testing, Normal State Test, Operational State Test