Manuals
/
State Industries
/
Household Appliance
/
Electric Heater
State Industries
SHE50-100PE, SHE50-100NE, GP650HTPDT Tennessee Waltz Parkway Ashland City, TN
Models:
GP650HTPDT
SHE50-100NE
SHE50-100PE
1
54
54
Download
54 pages
60.84 Kb
47
48
49
50
51
52
53
54
<
>
Wiring Diagram
Fault Messages
Correctly Wired Outlet
Resetting the control system
Operating SET Point Adjustment
GAS Pressure Testing
Service Notes CCB Replacement
J3 Socket 120 VAC Power Supply
Service Handbook
Control System Features
Page 54
Image 54
500 Tennessee Waltz Parkway
Ashland City, TN 37015
2
Page 53
Page 54
Image 54
Page 53
Contents
Service Handbook
Ultra High Efficiency Power VENT/POWER Direct Vent
Qualifications Qualified Service Agent
Service Warning
Important Service Reminder
Tools Required
Closed Water Systems
Thermal Expansion
AIR Requirements
Contaminated AIR
Venting
Maximum Equivalent Length Requirements
Maximum Elbow Requirements
Service Notes Venting
Pipe Size Requirements
Number Maximum Pipe Elbows Length Feet Meters
Correctly Wired Outlet
Service Notes Electrical
VAC 1Ø Power Supply
Electrical Requirements
HOW IT Works
Internal View
Service Notes Blower
Blower
Service Notes Burner Flame Sensor
Burner
Burner & Blower Removal
On Next
Service Notes Blower Flange & Blower Adapter Gaskets
Burner/Blower Removal
Venturi
Blower
GAS Valve
Gas Valve Removal
Gasket Orifice
GAS Pressure Testing
Service Notes Checking Gas Pressures
Service Notes Gas Pressure Adjustment
GAS Pressures
Gas Pressures
AIR Pressure Switches
Normal State Activated State
Blower Prover Switch
Blocked Intake Switch
Blocked Exhaust Switch
AIR Pressure Switch Operation
Blower Prover Failure
AIR Pressure Switch Testing
Normal State Test
Operational State Test
Air Pressure Switch Parameters
Pressure Test
Blower Prover Blocked Intake Blocked Exhaust
Page
Flame Sensing Test
Measuring Flame Sensing Current
Flame Sensor
Service Notes Hot Surface Igniters
Igniter Current Test
Control System Features
Introduction
Service Notes Button Pad Ribbon Cable
UIM
Commercial & Residential Product Differences
Discreet Menu Contact Information
Service Note Sequence of Operation Display
Desktop Screen
Status Icons
Status Icon Description
Operational States Modes
State Description
Operating SET Point Adjustment
Action Display
Control System Menus
ECO
Service Notes CCB Replacement
CCB
J10 J13 J15 J11 J16
Socket Identification
J2 Socket 120 VAC To Blower
J3 Socket 120 VAC Power Supply
J1 Socket Transformer
PIN # Description
Retry
Ext Use Yes Input Type Tstat Open
Wiring Diagram
Service Notes Polarity & Ground
Sequence of Operation
YES
Rough Starting Rough Operation Note
Resetting the control system
Important Service Reminder
Heater Status Menu
UIM is Inoperable
Control System Unresponsive
UIM Display Is Blank
Displayed Message CHECK/REPAIR CONDITION/INDICATES
Fault Messages
AC Reversed
Flame Probe Short
Upper Probe Short
Flame Detect Error
Energy Cut Out ECO
Blocked Inlet
Blocked Exhaust Vent
Perform ALL These Tests with Power
Blower Prover Open
Turned on and a Call for Heat Active
Low Igniter Current
Ignition Failure
Rough Starting Rough Operation Note
Check for 24 VAC to the Gas Valve solenoid coil
Gas Valve Failure
Communication Failure
Tennessee Waltz Parkway Ashland City, TN
Top
Page
Image
Contents