- 8 -
Chapter2 Setup
This chapter describes the procedure for connecting the Autoloader to a basic processing device
such as a server or workstation.
Important
Maintenance personnel will perform the rack installation or removal work for
the Tandberg LTO2 Autoloader.

2.1 Preparation Before Use

Before using the Autoloader, remove the transporter locking screw that is a type of thumbscrew
located at the left side of the decorative cover.
Important
Remove the transporter locking screw before switching ON the power switch.
Switching ON the power while the transporter locking screw is still attached
could result in damage to the Autoloader.

Removal of the Transporter Locking Screw and Instruction TAG

1. To loosen this screw turn to counterclockwise by hand.
2. Remove the Instruction TAG with the Transporter Locking Screw (see figure 2-1).
3. As the Transporter Locking Screw will be needed to ship or move the Autoloader, insert
it into the hole and tighten to keep it (see figure 2-2).
Figure 2-1 Removal of the Transporter Locking Screw and Instruction TAG
Transporter Locking Screw
Instruction TAG