Teledyne 6750 operating instructions Shutdown, Historical Data

Models: 6750

1 96
Download 96 pages 40.67 Kb
Page 53
Image 53
4.5 Shutdown

Total Organic Carbon Analyzer

Setup and Operation

 

 

 

4.5 Shutdown

Prior to shutdown of the analyzer or performing service on the

reactor, flush D. I. water through all sample and reagent lines for at least 30 minutes to clean all tubing.

CAUTION: FAILURE TO OBSERVE ADEQUATE FLUSHING COULD RESULT IN HARMFUL ACID BURNS AND/OR A REACTOR CLOG.

4.6 Historical Data

Previous data may be obtained by selecting [CHART] from the screen. The following menu will appear.

The display scale can be adjusted using the Select [TOC SCALE] item from the [CHART] menu. The following screen will appear.

Edit Scale as desired.

Teledyne Analytical Instruments

41

Page 53
Image 53
Teledyne 6750 operating instructions Shutdown, Historical Data